Skip to Content
Keller-Heartt has Truegard Propylene Glycol Heat Transfer Fluids in both Inhibited and Food Grade! Order Today!
Propylene Glycol Available. Order Today!

UltraTech 8568 Ultra-Containment Berm, Foam Wall Model, 3' x 3' x 4", Copolymer 2000

SKU B2352835
Original Price $799.28 - Original Price $799.28
Original Price
$799.28
$799.28 - $799.28
Current Price $799.28

THE ULTRA-CONTAINMENT BERM, FOAM WALL MODEL PROVIDES CONTAINMENT FOR SMALLER SPILLS, LEAKS AND DRIPS. IT HAS TRUE DRIV-IN AND DRIVE-OUT CAPABILITY AND REQUIRES NO SETUP OTHER THAN THE INITIAL DEPLOYMENT. LOW, 4-INCH SIDEWALL CONTAINS SPILLS-KEEPS PLANT FLOORS AND SOIL FREE FROM CONTAMINATION. BUILT-IN HANDLES HELP WITH TRANSPORT AND PLACEMENT.

Frequently asked questions

Find answers to common questions about our products and services
  • This berm is designed to contain smaller spills, leaks, and drips, helping to keep plant floors and soil free from contamination.

  • No assembly is required beyond the initial deployment — once it is in place, it is ready to use without any additional setup.

  • Yes, this berm is built with true drive-in and drive-out capability, allowing vehicles to enter and exit without needing to reposition or remove the berm.

  • Built-in handles are incorporated into the design specifically to assist with transporting and placing the berm.

  • The 4-inch foam sidewall is intended for smaller spills, leaks, and drips within the 3' x 3' footprint — for larger volumes or higher-risk applications, a deeper or larger berm model may be more appropriate.

Key Features

  • Designed to contain smaller spills, leaks, and drips, keeping plant floors and soil free from contamination

  • True drive-in and drive-out capability allows vehicles to enter and exit without removing the berm

  • Requires no setup beyond initial deployment, making it immediately ready for use

  • Low 4-inch foam sidewall provides spill containment while minimizing access obstruction

  • Built-in handles allow for easy transport and repositioning during placement