Skip to Content
Keller-Heartt has Truegard Propylene Glycol Heat Transfer Fluids in both Inhibited and Food Grade! Order Today!
Propylene Glycol Available. Order Today!

UltraTech 8466 Ultra-Containment Berm, Foam Wall Model, 4' x 4' x 4", 22 oz. (24 mil) PVC

SKU B2352836
Original Price $287.36 - Original Price $287.36
Original Price
$287.36
$287.36 - $287.36
Current Price $287.36

THE ULTRA-CONTAINMENT BERM, FOAM WALL MODEL PROVIDES CONTAINMENT FOR SMALLER SPILLS, LEAKS AND DRIPS. IT HAS TRUE DRIV-IN AND DRIVE-OUT CAPABILITY AND REQUIRES NO SETUP OTHER THAN THE INITIAL DEPLOYMENT. LOW, 4-INCH SIDEWALL CONTAINS SPILLS-KEEPS PLANT FLOORS AND SOIL FREE FROM CONTAMINATION. BUILT-IN HANDLES HELP WITH TRANSPORT AND PLACEMENT.

Frequently asked questions

Find answers to common questions about our products and services
  • Yes, this berm is built with true drive-in and drive-out capability, so vehicles and equipment can enter and exit freely without needing to move or collapse the sidewalls.

  • No assembly is needed beyond the initial deployment — once it is placed in position, it is immediately ready for use.

  • It is designed to contain smaller spills, leaks, and drips, helping keep plant floors and soil free from contamination.

  • Built-in handles are incorporated into the design specifically to assist with moving, transporting, and placing the berm.

  • The 22 oz. rating refers to the fabric weight and 24 mil refers to the thickness of the PVC — together these figures indicate the gauge and weight class of the material used to construct the berm walls and floor.

Key Features

  • Designed to contain smaller spills, leaks, and drips, keeping plant floors and soil free from contamination

  • True drive-in and drive-out capability for vehicles or equipment without disrupting workflow

  • Ready to use immediately after initial deployment with no additional setup required

  • Low 4-inch foam sidewall provides effective spill containment while remaining easy to access

  • Built-in handles allow for convenient transport and repositioning of the berm